Oil Fuel Magnetostrictive Floats Level Sensor

Tank construction requirements
For new station, the probe should be installed in the middle of tank. The distance between probe and discharging/unloading tube, submersible pump should be more than 1 meter. Otherwise, the probe accuracy will be reduced and probe will be damaged. Pay attention to adjusting oil outlet direction of discharging tube
to make oil flow direction back to the probe. The riser/rising tube must be vertical welding. .

Remarks:
Either new or old station, the installation hole of probe and tank manhole must be on the axis of the oil tank, so as to ensure the probe and tubing, discharge tubing are installed vertically. If is submersible pump,the direction of discharge outlet can not be opposite the submersible pump